
// FAT BIKE
L1
48V 15Ah · 20×4.0 · 60–80 km · 180 / 40HQ
Urban shop and private label
Start from a validated platform. Specify color, powertrain, branding, components, and packaging — without opening new frame tooling.
Compare L1, L2, and L3 below. Then specify color, motor, battery, and branding against that frame.

// FAT BIKE
48V 15Ah · 20×4.0 · 60–80 km · 180 / 40HQ
Urban shop and private label

// FAT BIKE
48V 15Ah · 20×4.0 · 60–80 km · 160 / 40HQ
Distributor and premium fat-tire line

// E-MTB
48V 30Ah · 20×4.0 · 80–120 km · 150 / 40HQ
E-MTB and specialist channel
Specify these against L1, L2, or L3. Frame geometry stays locked unless you open a custom program.
From 20 units per platform · no new tooling
Quoted against the chosen platform. Frame, envelope, and jigs stay — no new molds.
From 50 units per SKU · new engineering
New frame geometry, new molds, or an enclosure that does not fit the platform.
Color & finish
Decals & branding
Motor
Battery
Display & firmware
Components
Packaging
Frame geometryMotor, battery, and display are quoted against the chosen platform. A part that does not fit the frame, or a new frame geometry, is a custom program — from 50 units per SKU.
One production team. Four stations. Used when the brief needs them — not on every ODM order.

3D fit on L1/L2/L3. Functional sample in 7–14 days, sign-off before PO.
Platform jigs in stock. New frame tooling only if the brief leaves the envelope.
Robotic welding, powder coat, 100% dyno and brake check before packing.
Pantone match, water-transfer decals, 5-layer export carton, multi-language manual.
Private label is the default motion. The others change firmware, durability, and paperwork.
Your brand on L1, L2, or L3. This is the default ODM brief.
Stock spec plus regional firmware, manuals language, and a repeat MOQ.
Durable finish, serviceable BOM, spare-parts kit, GPS option.
EN 15194 or UL file set, batch traceability, locked delivery window.
Send the platform, the layers you want changed, target market, and volume. Reply includes feasibility, MOQ, EXW/FOB pricing, and lead time within 1–2 business days.