CLIPCLOP
// OEM / ODM FROM GUANGZHOU

OEM / ODM e-bike
production.

25,000 m² Jiangmen facility. OEM/ODM engineering, in-house production lines, 100% pre-shipment QC, export-ready documentation.

Request a Quote
// FOR BUSINESS BUYERSDEALERSDISTRIBUTORSFLEET OPERATORSPRIVATE-LABEL BRANDSWHOLESALE BUYERSOEM / ODM
// OEM REFERENCE PLATFORMS

Production-ready platforms for your brief.

ClipClop L1 OEM electric bike
// L Series · Supermotor Fat Bike

ClipClop L1

SKU: L1
ClipClop L2 OEM electric bike
// L Series · Supermotor Fat Bike

ClipClop L2

SKU: L2
ClipClop L3 OEM electric bike
// L Series · Supermotor Fat Bike

ClipClop L3

SKU: L3
// PRODUCT CATEGORIES

Select a platform for your brief.

Browse Full Range →
// L1 · INDEPENDENT VIDEO REVIEW

The Bike Cave reviews L1.

An independent YouTube review from The Bike Cave, featuring their first impressions of the L1 and its unexpectedly low price.

// REVIEWER · THE BIKE CAVE · INDEPENDENT YOUTUBE CHANNEL

Watch The Bike Cave’s review, “Can’t BELIEVE the Low Price of this E-bike!”, for an independent take on the L1.

THE BIKE CAVEVIDEO REVIEWL1 E-BIKEON YOUTUBE
REQUEST L1 SAMPLE
// ENGINEERING & PILOT BUILDS

Build around your requirements.

Specify the motor, battery, frame, finish, and packaging. Pilot samples are reviewed before bulk production so your team can approve the actual build.

  • Pilot samples reviewed before bulk production
  • Motor, battery, finish, and packaging options
  • Specification and QC records for each run
Discuss Your Project
// QUALITY CONTROL

Quality checks before shipment.

Incoming parts, in-process assembly, functional testing, and pre-shipment inspection are documented for each production order.

  • Incoming partsSupplier and component checks before assembly
  • Assembly checksTorque, braking, and electrical function review
  • Functional testRide-test and end-of-line diagnostics
  • DocumentationModel-specific reports and export files
  • Final inspectionVisual, functional, and packing review
  • TraceabilityBuild records retained for the production order
Review Quality Process
// REQUEST THE CURRENT CATALOG

Current product catalog.

Share your company and target market. We will reply with current platforms, MOQ guidance, and available documentation.

WHAT YOU WILL RECEIVE
  • Current platform range with key specifications
  • MOQ, pricing basis, and lead-time guidance
  • Direct contact for OEM/ODM and sample questions
// PRODUCTION CAPACITY

Capacity & lead time.

A single-roof operation in Guangzhou with dedicated production lines, quality gates, and documented shipping preparation. Confirm available capacity and lead time with your project brief.

60K+UNITS / YEARAnnual capacity across all lines
3PRODUCTION LINESFrame, motor, final assembly
4,500M² FACILITYSingle-roof, no subcontracting
8+YEARS OEMContinuous OEM since 2017
// IN-HOUSE CAPABILITIES

Production, QC, packing, and export support under one factory team.

STAGE 01

Frame welding

MIG/MAG production cells and hand-finished prototypes. Frame geometry is checked against approved drawings before paint.

STAGE 02

Surface treatment

Primer, powder coat, and OEM color application with finish samples approved before the run.

STAGE 03

Motor integration

Hub and mid-drive units are paired with displays, wiring, and firmware before final assembly.

STAGE 04

Battery integration

Cell, BMS, charging, and enclosure requirements are checked against the approved specification.

STAGE 05

Quality control

Incoming parts, in-process checks, end-of-line function, and pre-shipment review are recorded.

STAGE 06

Packaging and loading

Retail-ready cartons, foam protection, CKD options, and container loading plans are confirmed before sealing.

// LEAD TIMES

From PO to container

How long each program takes from purchase order to sealed container. All windows are confirmed before production starts.

Sample program4–6 weeks1–3 units, stock color, single SKU
First production run30–45 daysCustom color, decal, packaging
Repeat orders25–30 daysExisting spec, stock components
Full ODM program60–90 daysNew tooling, packaging, documentation
MANUFACTURING · CAPACITY · LEAD TIME · QCREQUEST CAPACITY SHEET ↗
// EXPORT SUPPORT

Ready for your first shipment.

Export documentation, production timing, and shipping terms (EXW, FOB, CIF) confirmed within 2 business days.

24+ACTIVE PARTNERS
11+COUNTRIES SHIPPED
4,800+UNITS SHIPPED
91%ON-TIME SHIPMENT
Plan your project with our export team.Become a Partner →
// FACTORY NOTES

Updates from production and product development.

View All Updates →
// Market Insights

E-Bike Frame Materials in Brazil: Why the ClipClop L1 Uses 6061 Aluminum Instead of Carbon Fiber or Steel

Hey. I'm Leo Liang. I do sales for ClipClop Bike — that factory in Guangzhou you've probably seen on Alibaba if you've ever searched "fat tire e-bike OEM" at 2 AM. I've been at this since 2017. Seen

// Buying Guides

Best E-Bike Brakes for Colombia in 2026

Look, I've been staring at brake calipers for way too long. Nine years at ClipClop Bike means I've spent thousands of hours talking with dealers who want the cheapest container possible, only to…

// Market Insights

Stop Sending Skinny Bikes to Brazil: What I Learned the Hard Way at ClipClop

I’m Leo Liang. I sell bikes for ClipClop in Guangzhou. Not the fancy corner office type. I’m the guy who checks WhatsApp at midnight and yells at the warehouse when they forget to pack the chargers.

// Market Insights

Best E-Bike Types for New York City in 2026

Hey, I'm Leo. I work at ClipClop Bike in Guangzhou. I spend my days talking to dealers, fleet operators, and stubborn end-users who think they know everything because they watched three YouTube

// Resources

NYC E-Bike Laws 2026: What Importers Must Know

NYC E-Bike Laws 2026: What Importers Must Know Hey, I'm Leo. I do sales at ClipClop Bike in Guangzhou.

// Buying Guides

E-Bike Handlebars Mexico 2026: A ClipClop L2 Sales Guide

Okay. Full disclosure: I’m Leo Liang, export sales at ClipClop Bike in Guangzhou. We’ve been shipping containers to Mexico since 2021, maybe 2022—the years blur when Chen, our lead engineer, argues

// START A PROJECT BRIEF

Submit your project brief.

Target market, use case, target price, and expected volume reviewed by the export team within 2 business days. Initial quote, MOQ, and lead time returned with the reply.

Reply within 1–2 business days